Ibeju-Lekki Compute Campus.
Africa’s first utility-scale AI power platform.

2,500 acres of controlled site in Lagos, Nigeria. Direct access to subsea fiber, gas supply, and water. Engineered for 10 GW of compute capacity by 2030.

0
Acres Controlled
250KW1000KW
Per-rack compute density
0
Subsea Cables
0MMscfd
Gas Supply
Master Site Plan

2,500 acres.
Purpose-built for AI.

Every zone optimized for its function. Generation clustered east for prevailing-wind isolation. Compute halls north for fiber proximity. Operations centered for response time.

Hypervolt Ibeju-Lekki master site plan — 2,500-acre campus with Generation, Storage, Compute Halls, Substation, and Operations zones
AI Power Platform

Fully integrated, multi-GW energy and AI infrastructure microgrids for hyperscale data center customers at continental scale.

Anchored by
Project Endeavour
Compute Campus in Ibeju-Lekki, Lagos, Nigeria
10 GW
AI Microgrid Platform
Founded by
DigitalSky Technologies
Campus Zones

Four functional zones.
One integrated system.

The campus is organized into four functional zones — each purpose-built for its role in the vertically integrated power-to-compute stack.

Zone A ~ 600 acres

Generation & Storage

Multi-fuel turbines, solar arrays, and battery energy storage systems clustered east of the site for prevailing-wind isolation and grid-independence.

Multi-fuel gas turbines
Utility-scale solar array
Grid-forming BESS
Long-duration storage
Zone B ~ 1,200 acres

Compute Halls

Four primary compute halls with expansion capacity for twelve additional halls. Liquid-cooled, power-dense, built to 250KW–1000KW per rack from day one.

Halls A through D (initial)
Direct liquid cooling
250KW–1000KW per rack
12-hall expansion capacity
Zone C ~ 250 acres

Substation & Switching

High-voltage transmission and switching infrastructure positioned at the geometric center of the campus for shortest cable runs and lowest distribution losses.

330 kV substation
HV switching yard
Grid interconnect
Step-down transformers
Zone D ~ 450 acres

Operations & Support

Control room, NOC, security perimeter, administrative offices, and on-site staff facilities. Positioned for sub-second response to any zone.

24/7 NOC and control room
Security perimeter
Administrative offices
Staff facilities
Site Infrastructure

Gas. Water. Fiber.
Built into the ground.

Every critical utility is delivered on-site, behind the meter, with redundant feeds and dedicated infrastructure — not leased, not shared, not dependent on third parties.

01 / Gas Supply

Dedicated pipeline. Behind the meter.

A dedicated gas pipeline delivers 500 MMscfd directly to the campus. Behind-the-meter procurement eliminates grid dependency, secures pricing, and ensures continuous baseload for AI compute.

500 MMscfd
Capacity
Dedicated
Pipeline
Behind-the-meter
Procurement
Multi-fuel
Flexibility
02 / Water

Closed-loop cooling. Zero waste.

60 ML/day allocated for cooling and operations. Closed-loop systems recycle water continuously, with zero liquid discharge to the environment. Engineered for water-stressed conditions.

60 ML/day
Allocation
Closed-loop
Recycling
ZLD
Zero Liquid Discharge
On-site
Treatment
03 / Fiber

Eight subsea cables. A few meters away.

Eight major subsea cables land within a few meters of the campus — SAT-3, WACS, ACE, MainOne, and Equiano. Diverse landings, redundant feeds, 100 Gbps+ backbone to Europe, Americas, and the rest of Africa.

8
Subsea Cables
A few meters
Cable Landings
100 Gbps+
Backbone
Diverse
Routes
Strategic Location

Why Ibeju-Lekki.

Lagos is Africa’s largest city and the commercial capital of Nigeria. Ibeju-Lekki sits within the Lekki Free Zone — Special Economic Zone status with infrastructure, regulatory clarity, and political will for industrial-scale deployment.

IBEJU-LEKKI 6.45°N · 3.55°E LAGOS ISLAND LEKKI-EPE HWY SUBSEA CABLES
SEZ
Lekki Free ZoneSpecial Economic Zone status with tax incentives and regulatory clarity.
A few meters
Subsea cable proximityFive major cables (SAT-3, WACS, ACE, MainOne, Equiano) land within 8 km.
45 min
Lagos Island accessDirect highway connectivity to Nigeria’s commercial capital via Lekki-Epe Expressway.
Tier-1
Political and regulatory supportFederal and state government alignment on industrial-scale infrastructure deployment.
Development Timeline

From groundbreaking
to continental scale.

2026
Site Preparation
Earthworks, foundation systems, perimeter security, and first generation assets under construction and initial capacity live.
2027
Generation Online
First gas turbines and substations commissioned. Storage systems online. Compute halls under fit-out.
2028
2 GW Online
2GW compute capacity live. First sovereign AI workloads running on Nigerian infrastructure.
2030
Full Capacity
Full enabled capacity operational. 10 GW online. Africa positioned as a net exporter of intelligence.

Africa’s first sovereign
AI power platform.